Translation of "Surge test" in German

Surge currents such as those which can occur as a result of lightning strikes are simulated in a surge current test such as this.
Bei einer derartigen Stoßstromprüfung werden Stoßströme, wie diese infolge von Blitzschlägen auftreten können, simuliert.
EuroPat v2

The standard test sequence consists of DC and/or AC hipot tests, a resistance test and a surge test.
Die Standard-Prüfsequenz umfasst DC- und/oder AC-Hipot-Tests, eine Widerstands- und eine Stoßspannungsprüfung.
ParaCrawl v7.1

Simultaneous satisfaction of both tests and additional satisfaction of the surge-current test, which is likewise required, and in which no-trip is required in response to very brief (for example, 8 ?s rise time and 20 ?s fall time to half the peak value) fault currents whose amplitude is nevertheless very high (for example 250 A), demands a specific solution, particularly when the aim is to achieve a time delay which is as constant as possible, irrespective of the type of fault current, with designs which are sensitive to pulsed current or all currents and have to satisfy various tripping requirements for different tripping fault currents.
Die gleichzeitige Erfüllung beider Prüfungen und die zusätzliche Erfüllung der ebenfalls geforderten Stoßstromprüfung, bei der die Nichtauslösung bei zeitlich sehr kurzen (z.B. 8µsec Anstiegszeit und 20µsec Rückenhalbwertszeit), jedoch in der Amplitude sehr hohen Fehlerströmen (z.B. 250A) gefordert ist, erfordert eine spezielle Lösung, insbesondere dann, wenn bei pulsstrom- oder allstromsensitiven Ausführungen, welche diverse Auslöseanforderungen bei unterschiedlichen Auslösefehlerströmen erfüllen müssen, eine möglichst konstante Zeitverzögerung, unabhängig von der Fehlerstromform, erreicht werden soll.
EuroPat v2

When performing surge tests the generators will automatically set the required source impedance depending on the standard and the coupling mode.
Bei Durchführung der Surgeprüfungen werden die geforderten Quellenimpedanzen je nach Norm und Koppelmodus automatisch ausgewählt.
ParaCrawl v7.1

The coupling networds CNV504S/508S are specifically designed for surge/telecom surge tests on telecom lines as per IEC/EN 61000-4-5.
Die Koppelnetzwerke CNV 504S/508S sind speziell für Surge bzw. Telekom-Surgeprüfungen auf Telekommunikationsleitungen gemäß IEC/EN 61000-4-5 entworfen worden.
ParaCrawl v7.1

As per IEC/EN 61730-1/2 requirements for surge testing of photovoltaic panels these shall be wrapped with copper foil.
Gemäß den Anforderungen der EN/IEC 61730-1/2 für Surge-Prüfungen an Photovoltaikpanels müssen diese mit Kupferfolie umwickelt werden.
ParaCrawl v7.1

For instance, at high voltages, the distances between the coils associated with the three phases are relatively large in order to withstand the voltage loads during the surge voltage withstand testing.
Insbesondere bei hohen Spannungen werden die notwendigen Abstände zwischen den den drei Phasen zugeordneten Spulen relativ groß, um den Spannungsbeanspruchungen bei der Stoßspannungsprüfung standzuhalten.
EuroPat v2

CNV 504/508 N- and T-series coupling/decoupling networks are available to perform surge tests on I/O lines, signal/data lines and telecom lines as per IEC/EN 61000-4-5 Ed 3.0.
Die CNV 504/508 N- und T-Serie Koppel-/Entkoppelnetzwerk ist erhältlich um Surgeprüfungen auf I/O Leitungen, Signal-/Datenleitungen und Telekommunikationsleitungen gemäß IEC/EN 61000-4-5 Ed 3.0 durchzuführen.
ParaCrawl v7.1

For combination wave surge tests on high-current mains supply lines its capability can be extended by an external CDN to achieve nominal currents of 100A and more per phase.
Für Surge-Prüfungen mit hohem Strom kann das Gerät mit einem externen CDN erweitert werden, um Nennströme von bis zu 100 A und mehr pro Phase zu erreichen.
ParaCrawl v7.1

The coupling networks CNV 504T5 and CNV 508T5 are designed as per EN/IEC 61000-4-5 for Surge tests on Telecom lines.
Die Koppelnetzwerke CNV 504T5 und CNV 508T5 wurden für Surgeprüfungen auf Telekommunikationsleitungen gemäß EN/IEC 61000-4-5 entwickelt.
ParaCrawl v7.1

CNV 504/508 N- and T-series coupling/decoupling networks are available to perform surge tests on I/O lines, signal/data lines and telecom lines as per IEC/EN 61000-4-5 Ed 3.0
Die CNV 504/508 N- und T-Serie Koppel-/Entkoppelnetzwerke sind erhältlich um Surgeprüfungen auf I/O Leitungen, Signal-/Datenleitungen und Telekommunikationsleitungen gemäß IEC/EN 61000-4-5 Ed 3.0 durchzuführen.
ParaCrawl v7.1